How Long Does It Take to Install Kitchen Cabinets?
The Short Answer: A professional team typically takes 2-3 days to install kitchen cabinets in an average-sized kitchen, while DIY installation usually requires 4-7 days. The timeline depends on kitchen size, cabinet quantity, and installation complexity.
Planning a kitchen cabinet installation project? Understanding the time commitment is the first step to a successful renovation. Whether you’re considering hiring professionals or taking on the project yourself, several factors influence the installation timeline. The size of your kitchen and number of cabinets play major roles, as does the complexity of your layout. A straightforward galley kitchen with basic cabinets moves faster than an L-shaped space requiring corner units and custom modifications.
This guide breaks down realistic timeframes for both professional and DIY installations. You’ll discover how preparation impacts your schedule, what skills matter most, and which steps tend to take the longest. By the end, you’ll have a clear picture of the time investment needed for your specific kitchen cabinet project, helping you plan your renovation with confidence.
Kitchen Cabinet Installation Planning and Preparation Time
Proper planning for kitchen cabinet installation typically takes 1-2 days and forms the foundation for a successful kitchen renovation project. Before any new cabinets are mounted, several preparatory steps require careful planning.
Tools
The basic tool set should include:
- Level (both 4-foot and laser)
- Measuring tape
- Pencil
- Stud finder
- Drill/driver with bits
- Screwdrivers
- Ladder
- Clamps
- Miter Saw, Table Saw, or track saw.
You’ll also need a helper, safety equipment (work gloves, safety glasses), and mounting hardware specified by your cabinet manufacturer.
Measurements
Taking accurate measurements is a 2-4 hour process. Measure:
- Wall dimensions
- Ceiling height
- Window and door locations
- Utilities placement
Create a detailed kitchen layout diagram, marking cabinet positions, allowing for appliance clearance, and checking that cabinet dimensions match your kitchen space.
Receiving Cabinets
When your new kitchen cabinets arrive, store them in a climate-controlled area for 24-48 hours before installation. This allows the wood to adjust to your home’s humidity level. Stack boxes flat, not upright, and keep them off the floor using pallets or boards.
Removing Previous Cabinets
Removing old cabinets usually takes 4-8 hours, depending on the installation method and the number of cabinets. Upper cabinets should be removed first, followed by base cabinet units. Disconnect and cap any electrical work or plumbing connections before removal.
Wall Preparation Requirements
Wall preparation requires 2-4 hours.
- Start by checking walls with a level – most walls aren’t perfectly straight.
- Mark high and low spots that will need shimming.
- Locate and clearly mark all wall studs – they’ll support the cabinet’s weight.
- Note locations of electrical outlets, water lines, and gas pipes.
- Remove or relocate any obstacles that might interfere with cabinet installation.
Professional Kitchen Cabinet Installation Timeline

A professional cabinet installation process follows a structured timeline that varies based on your kitchen size and complexity.
- Small kitchens with 10 new cabinets or fewer typically take 1-2 days for complete installation.
- Average kitchen spaces containing 10-20 cabinets usually require 2-3 days.
- Larger kitchen designs with more than 20 kitchen cabinets can take 3-5 days for professional installers to complete.
Installation Phase Breakdown
- The process starts with base cabinet installation, taking approximately 30-40% of the total installation timeline. Installers begin at the corners, working their way around the kitchen’s perimeter, carefully leveling each unit.
- Wall cabinet mounting follows, consuming about 40% of the installation time. This phase demands careful planning as cabinets must align perfectly with both the base units and each other.
- The final 20-30% of time goes to hardware attachment, including cabinet doors, drawers, and pulls.
Special Features and Time Considerations
- Kitchen islands add roughly half a day to the kitchen cabinet installation schedule, as they require precise positioning and often include electrical work or plumbing connections.
- Corner cabinets typically add 1-2 hours per unit due to their complex angles and fitting requirements.
- Custom cabinetry modifications, such as trim work or filler panels, can extend the timeline by 2-4 hours depending on the complexity of the adjustments.
The total installation time also factors in preparation work, such as checking walls for level surfaces and marking utility locations. Professional installers often complete a thorough pre-installation inspection to avoid unexpected problems during the main installation phase.
DIY Kitchen Cabinet Installation Breakdown
A typical kitchen cabinet installation takes 5-7 days for an average kitchen with 15-20 new cabinets. While skilled DIY project enthusiasts might complete the installation process faster, most homeowners should plan for a full week to account for unexpected problems and ensure quality results.
Daily Progress Goals

Days 1-2: Preparation and Layout
Start by removing old cabinets and preparing walls. Mark stud locations, level lines, and cabinet positions. Install support beams for upper cabinets. This careful planning typically takes 1-2 days but saves time during actual installation.
Days 3-4: Upper Cabinet Installation
Mount kitchen cabinets first, working in pairs when possible. Begin at corners, moving toward the center. Attach cabinets to studs, checking level and plumb constantly. Install filler pieces and trim as needed.
Days 5-7: Base Cabinet and Finishing
Install base cabinets, starting from corners. Add peninsula or island units if included. Complete trim work, adjust cabinet doors, and install hardware. Final touches involve detail work like toe kicks and moldings.
Common Delays and Solutions
- Uneven walls: Use shims and careful measurements
- Missing tools: Create complete tool list beforehand
- Incorrect measurements: Double-check all dimensions before cutting
- Hardware issues: Sort and label all pieces before starting
Working Efficiently
- Work with a partner when handling kitchen cabinet installation.
- Keep tools organized in a rolling cart.
- Pre-assemble cabinet boxes if they arrive flat-packed.
- Take detailed measurements and photos before removing old cabinets.
Professional Help Indicators
Consider calling a professional installer if you encounter:
- Structural issues in walls or flooring
- Complex electrical work or plumbing modifications
- Severely uneven walls or floors
- Custom cabinetry modifications
- Installation timeline extends beyond 10 days
- Weight-bearing wall changes needed
Start Your Kitchen Renovation with Confidence

Kitchen cabinet installation typically takes 2-4 days for professional installers and 4-7 days for DIY installations, though this varies based on kitchen size and project complexity. The installation timeline depends on several practical factors:
- Kitchen size
- Cabinet type and quantity
- Existing layout modifications
- Installer’s experience level
For most homeowners, professional cabinet installation offers the best balance of time, quality, and peace of mind. Professional installers bring specialized tools, proven techniques, and the expertise to handle unexpected problems that could delay DIY projects. They also guarantee proper alignment and secure mounting – two aspects that directly impact your new kitchen cabinets’ longevity and functionality.
Ready to start your kitchen cabinet installation? Our team at Triumph Kitchens & Millwork can provide a detailed timeline and a free quote for your kitchen renovation project. Contact us today to schedule a consultation and join the many satisfied homeowners who trusted us with their kitchen transformations. Whether you’re planning a full kitchen remodel or just updating your cabinets, we’re here to help bring your vision to life.